Project involves the design and construction of a sludge reception and drying facility for the treatment of an estimated 1,400 – 1,800 tds of dewatered sludge from Clonmel Waste Water Treatment Works and other waste water treatment works in South Tipperary. The Contractor is required to operate and maintain the sludge dryer and sludge reception facilities and reuse/recycling of the final product for a period of 20 years and achieve specified performance levels during the operation period. The Sludge Dryer involves the evaporation of water from sludge cake to produce a dried granulate material of greater than 90% dry solids.

Client: Tipperary South CoCo
Status: Complete